Every project we carry out is an opportunity for us to showcase our extensive experience and professional skills. We know the wind industry environment and processes; we are familiar with their specifics and believe that we provide the most expert solutions and stand firm to our customers at every stage of their investment.

We develop in accordance with the needs of the energy market, follow all the opportunities it provides, concentrate our efforts, knowledge and experience in providing complete or partial solutions for the investment of our customers.

Right from the very beginning of the project idea, we analyse many options consistent with the connection opportunities and optimized location of the wind farm turbines in order to maximize the effect of using wind as an energy source. All design operations are in accordance with the environmental standards, and for this purpose we prepare environmental assessments and EIA reports. We prepare and coordinate all the technical documentation required for a building permit. During the construction activities and the installation of the turbines, modern and innovative technical solutions are used in strict application of the project documentation. Тhe process ends with the commissioning of the site and obtaining a permit for use.

During the operation of the already-constructed wind power plants, we take care of the technical maintenance of the turbines and the grid connection facilities. Throughout the operation process, accompanied by a constantly-changing regulatory framework, we perform trade and energy management of the wind farms.

380 MW

Completed projects

570 МW

Projects in progress

Year Wind Park Service type MW
2005 WPP Hadzhi Dimitar p, c 0.5
2006 WPP Hadzhi Dimitar p, c 1.2
2006 WPP Long Man p, ws 10
2006 WPP Vidno p, c 2.4
2006 WPP Arko p, c 1
2007 WPP B-Z Export p, c 0.6
2008 WPP Long Man c, tm, s 10
2008 WPP Kavarna c 32
2008 WPP Balchik c 10
2010 WPP Sveti Nikola c 156
2010 WPP Prolez dd 9
2010 WPP Hrabrovo p, ws 14
2010 WPP Dropla p, c, о&m, tm, cm, em, ws, s 1
2011 WPP Hrabrovo c, tm 14
2011 WPP Kavarna - EVN c 16
2011 WPP Ventus Nostrum dd 9.25
2011 WPP Dabrava 4MW p, ws 4
2011 WPP Dabrava 153MW p, ws 153.3
2012 WPP Gurkovo p, ws 31.7
2012 WPP Dabrava p, ws 153
2014 WPP Balgarevo dd 0.5
2014 WPP General Toshevo dd, ws 300
2014 WPP Patareshka polyana о&m, tm, i 6.6
2015 WPP Zbaszynek ws 29.7
2015 WPP Mogilishte - Sever dd 2
2015 WPP Zevs dd 0.6
2016 WPP Patareshka polyana s 6.6
2016 WPP Kavarna о&m, tm, cm 32
2016 WPP Kardam о&m, tm 12.6
2016 WPP Gurkovo - 1 tm, cm, s 0,25
2016 WPP Gurkovo - 2 tm, cm, s 0,25
2016 WPP Gurkovo - 3 tm, cm, s 0,25
2018 WPP Haos Invest о&m, tm 16
2018 WPP Long Man о&m, tm, cm 8
2018 WPP Hrabrovo о&m, tm, cm 14
2018 WPP Kavarna о&m, tm, cm 32
2018 WPP Krupen tm, s 12
2018 WPP Mogilishte 2 о&m, tm, cm, em 0.5
2018 WPP Gurkovo 4 о&m, tm, cm, em 1.98
2018 WPP Shabla о&m, tm, cm, em 0.6
2018 WPP Kardam - 1 о&m, tm, cm, em 4.2
2018 WPP Kardam - 2 о&m, tm, cm, em 4.2
2018 WPP Kardam - 31 о&m, tm, cm, em 2.1
2018 WPP Kardam - 32 о&m, tm, cm, em 2.1
2018 WPP Zevs о&m, tm, cm, em 0.6
2018 WPP Mogilishte Sever о&m, tm, cm, em 2
2018 WPP Vidno о&m, tm, cm, em, ws 2.4
2018 WPP Arko о&m, tm, cm, em, ws 1
2018 WPP Hadzhi Dimitar о&m, tm, cm, em, ws 1.7
2018 WPP B-Z Export о&m, tm, cm, em, ws 0.6
2018 WPP Vranino 1 о&m, tm, cm, em, ws 1.3
2018 WPP General Toshevo dd, ws 300
2019 WPP Eco Park Wind Power - 1 em 4.5
2019 WPP Mesomarket - 1 em 4.5
2019 WPP Mesomarket - 2 em 4.5
2019 WPP Haekon - 1 em 4.5
2019 WPP Topola ws 4
2019 WPP Krupen - 1 em 3
2019 WPP Krupen - 2 em 3
2019 WPP Krupen - 3 em 3
2019 WPP Krupen - 4 em 3
2019 WPP Chunchevo em 1.65
2019 WPP Krupen- WE p, ws 1.32
2019 WPP Long Man em 8
2019 WPP Hrabrovo em 14
2019 WPP Kavarna em 32
2019 WPP General Toshevo dd, ws 300
2019 HPP Bachevo em 1,3
2020 WPP Enel dd 42
2021 WPP Mogilishte - 3 о&m, tm, cm, em, dd 1.2
2021 WPP Dropla - 1 p, c, о&m, tm, cm, em, ws, s 2
2021 PV Kavarna 2 p, c, tm, cm, em 0.03
2022 PV Kupen Dyal cm, em, dd 1.28
2022 PV Bai Yaz cm, em, dd 3.36
2022 WPP Babovo p 3
2022 PV Gulyantsi dd 10
2022 WPP Natural Energy em 1.5
2022 WPP Pryaspa c 4
2022 WPP Ais em 4.5
2022 WPP Gorichane dd 40
2022 WPP Mogilishte Zapad - Repower p 43
2022 WPP Zograf p 245
2022 WPP Pet Mogili p 202
2023 WPP Long Man G6 p, c, ws 2
2023 Substation Kavarna (reconstruction) p, c
2023 Met Mast Pet Mogili, 120m p, c, ws
2023 PV Belene dd 3,639
2023 WPP Karnobat ws 122,4
2023 WPP Dobrin ws 57,6
2023 WPP Bdintsi ws 93,6
2023 WPP Zhiten ws 86,4
2024 WPP Mogilishte 1 о&m, tm, cm, em, dd, s 0,500
2024 PV Pavlikeni cm, em, dd 10
2024 PV Popovo dd 5
2024 WPP Shabla ws 100.8
2024 WPP Kamen Briyag ws 165.6
2024 WPP Gorichane ws 33.6
2024 WPP Praventsi ws 64.8
2024 WPP Novi Pazar p, ws 151,2
2024 WPP Omurtag p, ws 112,5
2024 WPP Glavan p, ws 202.5
2024 WPP General Toshevo ws 21.6
2024 Wind mast Karnobat 2 p, c, ws
2024 WPP Karnobat 2 p, ws 194.4
Share on Facebook Share on LinkedIn Email Tweet

Track record 2024

Download

Highlights

Acquisition of wind power plant Mogilishte-1 , Kavarna municipality

Acquisition of the ownership of wind power plant Mogilishte-1 with a capacity of 500 kW in the land of Mogilishte village, Kavarna municipality.
The proposed option for the transaction is in line with the interests of both parties.
The entire procedure for the acquisition of the Mogilishte-1 has been carried out as well as registration of the change in ownership with all counterparties and institutions in order to ensure the smooth operation of the wind power plant.

Translated with DeepL.com (free version)

Аssessment of the feasibility of sites for the development of a wind farm project in the region of Karnobat

The evaluation is based on the legal requirements, the potential impact on nearby residential areas through the moving shadow of the wind generators, the wind potential, and the transport access to the sites. Suitable parcels were selected for the development of the project and for the deployment of a total of 27 wind generators, with a total design capacity of nearly 200 MW. The potential risks to the project have been identified and mitigation or avoidance measures have been proposed.  

Legal and technical due diligence of a PV project, 5.0MW and electricity storage facility

In connection with the bankability study of PV power plant project Popovo 5.0MW, including an electricity storage facility, a legal and technical due diligence has been carried out. Upon review of the project documentation, including permitting documents and technical designs, expert opinions and recommendations have been provided.
The report examines the site ownership, construction permitting documents (legal and technical), the connection of the PV plant to the local operator's electricity distribution network as well as the installation of an electricity storage facility. The report includes an assessment of future energy yields under different scenarios with different probability levels (P50-P90). Capital and operating costs (CAPEX & OPEX) have been analyzed.
The legal and technical analysis (due diligence) was carried out in accordance with the scope of  the work requirements of the financing institution.

Design, construction and commissioning of WPP G-6, Vestas V80-2.0MW

The wind power plant is located in the town of Kavarna, municipality of Kavarna and was implemented with a wind turbine VESTAS V80-2MW.
The WPP is connected by a 3 km long newly constructed 20kV cable line to an existing switch substation owned by the same investor. A full scope of design works, complete construction of the WPP and commissioning have been carried out for the project. The WPP is planned to be connected to the grid.