Projects

Projects

Every project we carry out is an opportunity for us to showcase our extensive experience and professional skills. We know the wind industry environment and processes; we are familiar with their specifics and believe that we provide the most expert solutions and stand firm to our customers at every stage of their investment.

We develop in accordance with the needs of the energy market, follow all the opportunities it provides, concentrate our efforts, knowledge and experience in providing complete or partial solutions for the investment of our customers.

Right from the very beginning of the project idea, we analyse many options consistent with the connection opportunities and optimized location of the wind farm turbines in order to maximize the effect of using wind as an energy source. All design operations are in accordance with the environmental standards, and for this purpose we prepare environmental assessments and EIA reports. We prepare and coordinate all the technical documentation required for a building permit. During the construction activities and the installation of the turbines, modern and innovative technical solutions are used in strict application of the project documentation. Тhe process ends with the commissioning of the site and obtaining a permit for use.

During the operation of the already-constructed wind power plants, we take care of the technical maintenance of the turbines and the grid connection facilities. Throughout the operation process, accompanied by a constantly-changing regulatory framework, we perform trade and energy management of the wind farms.

377 MW

Completed projects

850 МW

Projects in progress

Year Wind Park Service type MW
2005 WPP Hadzhi Dimitar p, c 0.5
2006 WPP Hadzhi Dimitar p, c 1.2
2006 WPP Long Man p, ws 10
2006 WPP Vidno p, c 2.4
2006 WPP Arko p, c 1
2007 WPP B-Z Export p, c 0.6
2008 WPP Long Man c, tm, s 10
2008 WPP Kavarna c 32
2008 WPP Balchik c 10
2010 WPP Sveti Nikola c 156
2010 WPP Prolez dd 9
2010 WPP Hrabrovo p, ws 14
2010 WPP Dropla p, c, о&m, tm, cm, em, ws, s 1
2011 WPP Hrabrovo c, tm 14
2011 WPP Kavarna - EVN c 16
2011 WPP Ventus Nostrum dd 9.25
2011 WPP Dabrava 4MW p, ws 4
2011 WPP Dabrava 153MW p, ws 153.3
2012 WPP Gurkovo p, ws 31.7
2012 WPP Dabrava p, ws 153
2014 WPP Balgarevo dd 0.5
2014 WPP General Toshevo dd, ws 300
2014 WPP Patareshka polyana о&m, tm, i 6.6
2015 WPP Zbaszynek ws 29.7
2015 WPP Mogilishte - Sever dd 2
2015 WPP Zevs dd 0.6
2016 WPP Patareshka polyana s 6.6
2016 WPP Kavarna о&m, tm, cm 32
2016 WPP Kardam о&m, tm 12.6
2016 WPP Gurkovo - 1 tm, cm, s 0,25
2016 WPP Gurkovo - 2 tm, cm, s 0,25
2016 WPP Gurkovo - 3 tm, cm, s 0,25
2018 WPP Haos Invest о&m, tm 16
2018 WPP Long Man о&m, tm, cm 8
2018 WPP Hrabrovo о&m, tm, cm 14
2018 WPP Kavarna о&m, tm, cm 32
2018 WPP Krupen tm, s 12
2018 WPP Mogilishte 2 о&m, tm, cm, em 0.5
2018 WPP Gurkovo 4 о&m, tm, cm, em 1.98
2018 WPP Shabla о&m, tm, cm, em 0.6
2018 WPP Mogilishte - 1 о&m, tm, s 0.5
2018 WPP Kardam - 1 о&m, tm, cm, em 4.2
2018 WPP Kardam - 2 о&m, tm, cm, em 4.2
2018 WPP Kardam - 31 о&m, tm, cm, em 2.1
2018 WPP Kardam - 32 о&m, tm, cm, em 2.1
2018 WPP Zevs о&m, tm, cm, em 0.6
2018 WPP Mogilishte Sever о&m, tm, cm, em 2
2018 WPP Vidno о&m, tm, cm, em, ws 2.4
2018 WPP Arko о&m, tm, cm, em, ws 1
2018 WPP Hadzhi Dimitar о&m, tm, cm, em, ws 1.7
2018 WPP B-Z Export о&m, tm, cm, em, ws 0.6
2018 WPP Vranino 1 о&m, tm, cm, em, ws 1.3
2018 WPP General Toshevo dd, ws 300
2019 WPP Eco Park Wind Power - 1 em 4.5
2019 WPP Mesomarket - 1 em 4.5
2019 WPP Mesomarket - 2 em 4.5
2019 WPP Haekon - 1 em 4.5
2019 WPP Topola ws 4
2019 WPP Krupen - 1 em 3
2019 WPP Krupen - 2 em 3
2019 WPP Krupen - 3 em 3
2019 WPP Krupen - 4 em 3
2019 WPP Chunchevo em 1.65
2019 WPP Krupen- WE p, ws 1.32
2019 WPP Long Man em 8
2019 WPP Hrabrovo em 14
2019 WPP Kavarna em 32
2019 WPP General Toshevo dd, ws 300
2019 HPP Bachevo em 1,3
2020 WPP Enel dd 42
2021 WPP Mogilishte - 3 о&m, tm, cm, em, dd 1.2
2021 WPP Dropla - 1 p, c, о&m, tm, cm, em, ws, s 2
2021 PV Kavarna 2 p, c, tm, cm, em 0.03
2022 PV Kupen Dyal cm, em, dd 1.28
2022 PV Bai Yaz cm, em, dd 3.36
2022 WPP Babovo p 3
2022 PV Gulyantsi dd 10
2022 WPP Natural Energy em 1.5
2022 WPP Pryaspa c 4
2022 WPP Ais em 4.5
2022 WPP Gorichane dd 40
2022 WPP Mogilishte Zapad - Repower p 43
2022 WPP Zograf p 245
2022 WPP Pet Mogili p 202
Share on Facebook Share on LinkedIn Email Tweet

Track record 2022

Download

Highlights

PURCHASE OF WIND FARM 'MOGILISHTE-SEVER'

The deal was finalized on September 29, 2015. Together with the seller, it was decided that the wind farm will be brought into the capital of a newly established company and the subsequent sale of 100% of the shares of its capital will be performed.

WIND STUDY, WIND FARM 'GURKOVO' - 42 MW, 17 WTG

Wind farm 'Gurkovo; is located in the area of the village of Gurkovo, Balchik municipality. The wind study includes a calculation of the expected annual energy production for 17 wind turbines. The analysis is based on measurements from measuring equipment installed on site.

LEGAL AND TECHNICAL DUE DILIGENCE OF A PROJECT WIND FARM 'PROLEZ'- 10.6 MW

For the purposes of the project purchase, a detailed legal and technical due diligence of the entire project documentation was performed. Wind farm 'Prolez' has a total installed capacity of 10.6 MW and consists of 3 wind turbines Vestas V90-3.0MW and 2 wind turbines Enercon E53-0.8MW.

EIA PROCEDURE, WIND FARM ‘DABRAVA’ - 153,3 MW, 73 WTG

Successfully finalized Environmental Impact Assessment (EIA) procedure of the Project for construction of wind farm ‘DABRAVA’ with a total capacity of 153.3 MW, consisting of 73 WTG in the lands of the villages Dabrava, Dropla, Kremena, Tsarichino, Senokos and Sokolovo, Balchik municipality.